Prevents a second worker from consuming the follow-up job and bailing on the still-held run lock, which would stall the run until the next scheduler tick. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| Contracts | ||
| Events | ||
| Jobs | ||
| Steps/Host | ||
| PipelineRegistry.php | ||
| RunRunner.php | ||
| StepResult.php | ||